First, a distinction worth knowing. Concrete does not dry, it cures. It is a chemical reaction between cement and water, not evaporation. That matters because the most common way people damage a new slab is by letting it dry out too fast, which stops the reaction before the concrete has reached its strength. Concrete that loses its water early ends up weaker and more prone to surface cracking, no matter how good it looked the day it was finished.
In practice, here is the timeline we give people in Wichita Falls, Burkburnett and Iowa Park. After 24 to 48 hours you can walk on it carefully, and we will usually have pulled the forms. At around seven days the concrete has reached roughly three quarters of its design strength, which is normally enough for a passenger vehicle on a residential driveway. At 28 days it is considered fully cured and ready for whatever it was built for, including heavy trucks and equipment on a shop or barn slab.
North Texas heat changes the front end of that. A slab poured in July behaves differently from the same slab poured in October. When it is over 90 degrees with wind, the surface can dry faster than the concrete can cure, so we pour earlier in the day, keep the surface damp, and on some jobs use a curing compound. If you drive past a fresh pour of ours in August and the surface looks wet, that is deliberate.
Cold works the other way. Below about 50 degrees the reaction slows down, and near freezing it can stall completely. Water in a slab that freezes before it has cured will expand and do permanent damage. On a cold snap we will either delay the pour or protect the slab, and we would rather move a date by a few days than hand you a compromised driveway.
A few things you can do to help. Keep vehicles off until we tell you it is ready, and that includes parking one wheel on the edge, which is where a slab is weakest. Keep sprinklers from blasting the surface for the first week. Do not seal it too early. And if you see fine hairline cracking in the first few weeks, tell us, because some of it is normal shrinkage and some of it is not, and the difference matters.
If you have a pour coming up and want to plan around the timing, call us. We will give you the real dates for your job rather than a generic number, because they depend on the mix, the thickness and what the weather is doing that week. Estimates are free.